Lead time calculator

Add up the days between placing a purchase order and having the stock ready to sell. Enter each stage and your daily sales, and the calculator shows your lead time, the stage that takes the longest, how many units you sell while you wait and the stock level at which to reorder. Everything runs in your browser.

Calculator

The prefilled numbers are a worked example, not typical lead times. Replace them with the days from your own purchase orders or your supplier's written quote.

Stages of the lead time, in days
From sending the order until the supplier confirms and starts on it.
Enter 0 if the supplier ships from stock the same day.
From leaving the supplier until arrival at the port or your door.
Enter 0 for domestic orders.
From arrival at your warehouse until the stock can be sold.
Demand while you wait
For one product. Enter 0 to see the lead time only.
Enter 0 if you hold none.

What this calculator works out

Lead time is how long you wait between placing a purchase order and having the goods ready to sell. This calculator adds up the stages of that wait in days, shows which stage takes the longest, and then uses your daily sales to work out how many units you sell in that time and the stock level at which to reorder.

If you already know the two dates, you do not need the stages: lead time is the date the goods were received minus the date the order was placed. The stages are useful when you are planning an order that has not happened yet, or when you want to see where the days go.

The formula

  1. Lead time from two dates = date received − date ordered.
  2. Lead time by stage = supplier order processing + production or picking + transit + customs and port handling + receiving and put-away.
  3. Lead time in weeks = lead time in days ÷ 7.
  4. Lead time demand = average units sold per day × lead time in days.
  5. Reorder point = lead time demand + safety stock.

Keep every stage in the same unit. If your supplier quotes working days, convert them to calendar days first, because your sales continue through the weekend.

Worked example

A store orders a product from an overseas supplier. The supplier takes 3 days to confirm the order and 20 days to make it. The shipment is 30 days in transit and 4 days in customs and at the port, and the warehouse needs 3 days to receive it and put it away. The store sells 12 units a day and keeps 100 units of safety stock.

  • Lead time: 3 + 20 + 30 + 4 + 3 = 60 days, or 8.6 weeks
  • Longest stage: transit, 30 of the 60 days (50%)
  • Lead time demand: 12 × 60 = 720 units
  • Reorder point: 720 + 100 = 820 units

So this store places the next order when stock on hand plus stock already on order falls to 820 units. If the supplier cut production to 10 days, the lead time would be 50 days and the reorder point 700 units.

Using the result

  • Measure lead time from your own purchase orders where you can. Take the order date and the date the stock was available, for the last few orders from the same supplier.
  • Look at how much those orders differ. A supplier that delivers in 45 days one time and 75 days the next needs more safety stock than one that always takes 60.
  • Start with the longest stage if you want a shorter lead time. Shaving a day off receiving does little when transit is half of the wait.
  • The calculator starts the clock when the order is placed. If you only place orders once a week, your stock also has to last until the next order day.

For the definition, the stages and what delays do to reordering, read our guide to lead time in the supply chain. To size the buffer itself, use the safety stock calculator.

Frequently asked questions

What is the lead time formula?

Lead time is the date the goods are received minus the date the order was placed. Counted by stage, it is supplier order processing plus production plus transit plus customs plus receiving, all in days.

How do I calculate lead time from two dates?

Subtract the order date from the date the stock was available to sell. An order placed on 1 March and put away on 30 April has a lead time of 60 days. Use calendar days unless your supplier quotes working days, and note which one you mean.

What is lead time demand?

It is the number of units you expect to sell while a replenishment order is on its way: average units sold per day times the lead time in days. At 12 units a day and a 60 day lead time, lead time demand is 720 units.

How does lead time set the reorder point?

The reorder point is lead time demand plus safety stock. With 720 units of lead time demand and 100 units of safety stock, you reorder when stock on hand plus stock on order falls to 820 units.

Should lead time include the time I take to place the order?

The usual formula starts when the order is placed, so it leaves out the days you spend deciding. If you only place orders once a week, plan for that review time as well, because your stock has to last through it.

Is this an estimate of my supplier's lead time?

No. It adds up the days you enter, and the prefilled numbers are an example, not typical lead times. Use your own purchase orders or your supplier's written quote.

Embed this calculator

You can put this calculator on your own site or blog for free. Paste the code below into an HTML block. Please keep the credit line under the frame.

Let the reorder draft use your lead times